CariDotMy

 Forgot password?
 Register

ADVERTISEMENT

View: 2395|Reply: 1

Table top

[Copy link]
Post time 19-12-2011 01:58 PM | Show all posts |Read mode
Hi,

I'm new here.  I want an opinion from you guys the kitchen cabinet contractor (Patric, Steve, Jeff) on the table top.  I have a concrete table top which my Indon contractor did for me during my recent kitchen renovation.  Less than 4 months the tiles skirting dropped.  If I would like to do the cabinet's doors, do I have to demolish the existing concrete top and rebuilt or take out the existing tiles and retile.

Thank you as your opinion will help me do my budget.
Reply

Use magic Report


ADVERTISEMENT


 Author| Post time 19-12-2011 02:13 PM | Show all posts
Very sorry, I've wrongly post this entry...
Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CariDotMy

21-2-2025 08:00 PM GMT+8 , Processed in 0.270174 second(s), 14 queries , Gzip On, Redis On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list