|
Hi,
I'm new here. I want an opinion from you guys the kitchen cabinet contractor (Patric, Steve, Jeff) on the table top. I have a concrete table top which my Indon contractor did for me during my recent kitchen renovation. Less than 4 months the tiles skirting dropped. If I would like to do the cabinet's doors, do I have to demolish the existing concrete top and rebuilt or take out the existing tiles and retile.
Thank you as your opinion will help me do my budget. |
|
|
|
|
|
|
|
Very sorry, I've wrongly post this entry... |
|
|
|
|
|
|
| |
|