CariDotMy

 Forgot password?
 Register

ADVERTISEMENT

View: 7558|Reply: 87

[Tempatan] Penduduk Damansara Protes lagi!

[Copy link]
Post time 29-4-2014 11:59 AM | Show all posts |Read mode

Community

Home > News > Community

Published: Tuesday April 29, 2014 MYT 12:00:00 AM
Updated: Tuesday April 29, 2014 MYT 6:52:36 AM

Protest against new lay-by



MORE than 200 Mutiara Damansara residents marched in protest against an MRT station lay-by for buses and taxis in Jalan PJU 7/1, as they fear it will negatively impact the traffic situation in the area.

The protest, organised by the Mutiara Damansara Owners and Residents Association (Mudora), was also attended by residents from nearby properties such as Surian Condominiums and Surian Residences.

The lay-by is currently being constructed by Klang Valley Mass Rapid Transit (KVMRT) contractor MMC-Gamuda, on the left side of Jalan PJU 7/1 (coming in from Persiaran Surian) in between the Persiaran Surian and Jalan PJU 7/7 intersections.

Mudora president Lee Lam Tat said the lay-by, measuring 125m in length, would be able to accommodate a bus, three taxis and three cars.





It was initially supposed to be built underneath the upcoming Curve Mass Rapid Transit (MRT) station along Persiaran Surian.

“The stretch of Jalan PJU 7/1 where MRT Corp wants to construct the lay-by is only 200m and already has traffic lights at either intersection,” he said.

Lee claimed the new sites for the lay-by were not made known to Mutiara Damansara residents and construction began without the residents being consulted.

He added that Jalan PJU 7/1 was already congested with traffic because it was a popular alternative route to Damansara Perdana, Mont Kiara, and the Kota Damansara and Sungai Buloh.

Many residents said it could take up to 30 minutes just to get out to Persiaran Surian from Jalan PJU 7/7.

“We are not against development and are in fact very happy that the MRT station is being built in the area.

“It is just that traffic here is already very bad and knowing Malaysians, the lay-by will see people double-parking and reducing a two-lane road into one-lane,” said Lee.

This would not only worsen the traffic situation, but also pose safety risks to pedestrians, he added.

A Mudora task force has collected over 1,000 signatures, petitioning MRT Corp to return the lay-by to the alleged original plan.

Subang MP R. Sivarasa, who also present during the march, said he would discuss the matter with Bukit Lanjan assemblyman Elizabeth Wong.

In a statement, MRT Corp said it had obtained approval for the station’s design, together with its entrance and lay-bys from both the federal and state governments.

The statement said the lay-by was built for commuters entering the future MRT station via “Entrance C”, that links to the lay-by via an elevated, covered pedestrian walkway.

Both the location and design of lay-bys for the MRT station were decided after a traffic study, that showed that Jalan PJU 7/1 had relatively low traffic compared to other main roads in the area.

MRT Corp stated that Entrance C and the lay-bys were being constructed on government reserve land that had been approved for the MRT project and that it had engaged Mudora on the design from September 2012 until February this year
Last edited by juan_reyes on 29-4-2014 12:00 PM

Reply

Use magic Report


ADVERTISEMENT


Post time 29-4-2014 12:02 PM | Show all posts
macam dekat beijing aje...

puak2 ni huluq tisu paper 4 rolls...settle la..





Reply

Use magic Report

 Author| Post time 29-4-2014 12:04 PM | Show all posts


Reply

Use magic Report

Post time 29-4-2014 12:07 PM | Show all posts
bukan kah utk kesenangan depa jugak? bagi mereka yang perlukan public transport tuh.
Reply

Use magic Report

Post time 29-4-2014 12:10 PM | Show all posts
mmg pe'el tak skolah parking tepi jalan bagai is the cause of the congestion in the first place in that area.


problem biasa nouveau riche areas: "oh donia lihatlah daku dan mesidis rekonku parking tepi jalan"

Lu apa tawwwww  
Reply

Use magic Report

Post time 29-4-2014 12:16 PM | Show all posts
mutiara damansara ni aman gitu
so kalau ada mrt bagai jadi dah tak exclusive
begitulah kerisauan org2 kaya, sombong dan bongkak
Reply

Use magic Report

Follow Us
 Author| Post time 29-4-2014 12:18 PM | Show all posts
jawapan dari pihak MRT corp..

MRT perjelas reka bentuk pintu masuk Stesen The Curve

Bernama | Kemas kini: April 27, 2014
(Diterbitkan pada: April 27, 2014 21:11 MYT)








  


   

  


email  




comments


MRT perjelas reka bentuk pintu masuk Stesen The Curve


close




KUALA LUMPUR: Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) mengulangi pendiriannya bahawa Stesen MRT Curve dan pintu masuknya  direka untuk memenuhi keperluan pengguna berpotensi yang berulang-alik di kawasan itu sama ada untuk bekerja, berniaga, membeli-belah atau bersantai.

MRT Corp dalam satu kenyataan hari ini berkata lokasi stesen pintu masuk itu  akan membolehkan orang ramai mengakses stesen dengan selesa, mudah dan selamat, sambil memastikan aliran lalu lintas lancar di jalan bersebelahan.

"Semua kelulusan bagi reka bentuk stesen itu termasuk pintu masuk dan hentian sebelah telah diperoleh. Ini termasuk kelulusan oleh kerajaan untuk skim laluan MRT Sungai Buloh-Kajang pada bulan Julai 2011 yang meliputi stesen MRT The Curve," menurut kenyataan itu.

Menurut kenyataan itu, MRT Corp juga ingin menekankan bahawa reka bentuk stesen termasuk tiga pintu masuk telah dipaparkan untuk tatapan orang ramai apabila Skim laluan MRT Sungai Buloh-Kajang dipaparkan selama tiga bulan mulai 14 Feb 2011 hingga 14 Mei 2011.

"Reka bentuk stesen ini juga merupakan antara perkara kepada empat sesi perjanjian spesifik dengan Persatuan Pemilik dan Penghuni Mutiara Damansara (persatuan yang mewakili penduduk di Mutiara Damansara) yang diadakan pada 15 Sept 2012, 19 Dis 2012, 10 Julai 2013 dan 25 Feb 2014," menurut kenyataan itu.

MRT Corp juga ingin menjelaskan bahawa Pintu Masuk C dan hentian sebelah sedang dibina di atas rizab kerajaan yang telah diluluskan bagi projek MRT, menurut kenyataan itu.

"MRT Corp juga ingin menekankan bahawa pembinaan Pintu Masuk C dan hentian sebelah tidak memerlukan perobohan dinding penghadang Mutiara Damansara Zon A. Walaupun pada hakikatnya pagar dan sebahagian daripada kawasan berpagar ini telah menceroboh di atas tanah kerajaan yang diperuntukkan untuk projek MRT," menurut kenyataan itu.

Kenyataan juga memaklumkan, Pintu Masuk C yang terletak di Jalan PJU7/1 bersebelahan jalan dari Hotel Royale Chulan, adalah satu daripada tiga Pintu Masuk yang sememangnya menjadi sebahagian daripada reka bentuk asal stesen MRT Curve.

"Pintu Masuk C bersambung dengan stesen MRT Curve yang terletak di sebelah Surian Tower melalui jejambat pejalan kaki berbumbung di Jalan PJU7/1. Bersama-sama pintu masuk ini, sebuah hentian sebelah akan dibina yang boleh memuatkan tiga buah teksi, sebuah bas dan tiga buah kenderaan persendirian.

"Dua buah stesen lagi terletak di Persiaran Surian Tower dan Pintu Masuk B terletak di Jalan PJU7/1 sebelah Royale Chulan," tambah kenyataan itu.


Reply

Use magic Report

Post time 29-4-2014 12:22 PM | Show all posts
so 4 kali spesifik meeting masa MRT jumpa persatuan penduduk 200 ekor yg komplen dok buat apa?

goyang telor?
Reply

Use magic Report


ADVERTISEMENT


Post time 29-4-2014 12:24 PM | Show all posts
alahai... bodohnya... ni antara puak puak yg nak menyalahkan kerajaan s'gor la nih
Reply

Use magic Report

Post time 29-4-2014 12:25 PM | Show all posts
kalo tak suka dok damansara...boleh bg alik kepada orang asli
Reply

Use magic Report

Post time 29-4-2014 12:26 PM | Show all posts
pasni ... dah ada mrt area mutiara damansara .. habis la hujung2 minggu harus penuh dgn muka indon, bangla, myanmar dan lain2 pati duk bersidaian kat the curve, ikano dan ikea tu.
Reply

Use magic Report

Post time 29-4-2014 12:26 PM | Show all posts
bo layan.... kat ttdi dah senyap dah
Reply

Use magic Report

Post time 29-4-2014 12:30 PM | Show all posts

DASH too close for comfort
Writer: Basil Foo
Published: Fri, 13 Jan 2012

PETALING JAYA: Anger against the proposed Damansara-Shah Alam Highway (DASH) was clearly seen when some 800 Mutiara Damansara residents held a protest last Saturday (Jan 7).

“We don’t want the highway to cut through Mutiara Damansara,” said Mutiara Damansara Owners and Resident’s Association (Mudora) president Tony Chung.

He led an irate group of residents from all ages on a two-kilometer walk along Jalan PJU 7/7 and 7/1 to vent their frustration at the proposed highway.

The proposed 17-metre tall elevated highway will run along Jalan PJU 7/7 and 7/1 and will be operated by concessionaire Projek Lintasan Kota Holdings Sdn Bhd (Prolintas).

Chung, who has stayed in the suburb for six years, said the construction of the highway here will inconvenience residents and destroy trees.
Mutiara Damansara residents protesting against the proposed DASH highway along Jalan PJU 7/7 on Saturday (Jan 7).

“Traffic congestion from the project will affect 2,000 landed properties, two condominiums and the Curve commercial area here,” he said.

Resident Kuan Chong Mei said she was worried about the air pollution from the highway as she suffers from asthma.

The 58-year-old former headmistress said the highway, which will be built just 50 metres away from her house in Mutiara Damansara Zone A, was too close for comfort.

“The traffic noise will cause me sleepless nights as the highway is very close to our housing area,” she said.

Resident Selvi Ebinesan, who moved into Zone C with her husband Daniel Ebinesan five years ago, said she was caught unaware by the proposed project.

The senior citizen in her 60s is worried for the safety of her nephews and nieces who will no longer be able to walk about the neighbourhood due to the increased traffic once the highway is completed.

“If I had known the highway would be here, I would not have bought this house,” she said.

“It is ridiculous to have a highway in an existing housing area, especially a matured residential area like this,” added long time resident Ong CH.

Mudora committee member Datuk Aminuddin Ariffin said to avoid massive traffic jams and pollution, alternative routes for the highway should be considered.

Also present was state executive councillor Elizabeth Wong who said while the Federal government approved the project, the state remains undecided.

“This project is not easy to approve. We will have to change the local plan and the Selangor structure plan,” she said.

Wong, who is also the Bukit Lanjan state assemblyperson, said she understood the residents’ grouses and agreed that the highway should be moved elsewhere.

She said the Petaling Jaya City Council (MBPJ) has been told to conduct a technical assessment to determine if the highway project is feasible.

“During a state executive council meeting, Menteri Besar Tan Sri Khalid Ibrahim also did not approve the highway and asked for the residents to be consulted first,” she added.



Selangor Times
- See more at: http://selangortimes.com/index.php?section=news&permalink=20120113124311-dash-too-close-for-comfort#sthash.LKBdCx1S.dpuf
Reply

Use magic Report

Post time 29-4-2014 12:31 PM | Show all posts
hek eleh... buat hiway protes.

buat mrt protes.



nanti bila siap, sita je stesen MRT tu. jangan bukak langsung. biar jadik hiasan je kat situ.


vudus.
Reply

Use magic Report

Post time 29-4-2014 12:32 PM | Show all posts
ala orang kaya...nak jaga hartanah dia la tue...boleh blah...
Reply

Use magic Report

Post time 29-4-2014 12:33 PM From the mobile phone | Show all posts
Ek ena..igt area dia je ke affected? Cheras xlah?

Bengong.:@
Reply

Use magic Report


ADVERTISEMENT


Post time 29-4-2014 12:40 PM | Show all posts
x nak pembangunan masuk utan la. x nak pembangunan sila berhijrah ke negara lain
Reply

Use magic Report

Post time 29-4-2014 12:41 PM | Show all posts
Orang mesikin berkali-kali memohon kemudahan MRT, orang kaya menolak pulak.
Reply

Use magic Report

Post time 29-4-2014 12:44 PM | Show all posts
NIXAR posted on 29-4-2014 12:40 PM
x nak pembangunan masuk utan la. x nak pembangunan sila berhijrah ke negara lain

mcm la area tu tak jam tanpa mrt... dah sedia teruk okeh...
Reply

Use magic Report

Post time 29-4-2014 12:45 PM | Show all posts
dino posted on 29-4-2014 12:44 PM
mcm la area tu tak jam tanpa mrt... dah sedia teruk okeh...

besa la. masing2 nak jaga reta property sure go up hwanggg la neh.....haram jadah sgt perangai. x nak jem blk kampung la woi.
Reply

Use magic Report

You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CariDotMy

7-12-2024 07:22 PM GMT+8 , Processed in 0.714632 second(s), 33 queries , Gzip On, Redis On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list